A Hillcrest family chose to stay in the area they loved and renovate their existing home. By changing the layout, they gained an island kitchen, a home office, an ensuite and better use of the existing floor space.

Location
Hillcrest, North Shore
Project
Home renovation
Approach
Change the existing layout
Key focus
Make better use of the existing space
Explore project

02 The project

A better home in the area they loved

The family liked their Hillcrest location, but the house no longer worked well for them. They needed another bathroom, better bedrooms, more storage and a better use of the existing floor space.

The house had one bathroom and no ensuite. A narrow bedroom was being used as a playroom, the hallway took up more space than it needed, and part of the living room had no clear use.

TRT reworked the home within its existing footprint: a U-shaped kitchen became an island kitchen, a living-room corner became a semi-enclosed home office, and the new layout made room for a master ensuite, walk-in wardrobe, better bedrooms and laundry. The structural changes required building consent; damaged drainage discovered beneath the slab was replaced and inspected.

Location
Hillcrest, Auckland
Family relocated
Approximately three months during construction
Completed spaces
Kitchen, home office, master suite, bathrooms and laundry

03 The transformation

A kitchen redesigned around an island

Closing an unused doorway created more wall space for cabinetry. The U-shaped kitchen was replaced with a central island, creating more room to move around the kitchen.

After: Hillcrest kitchen with a central island, white cabinetry and black refrigerator Before: Hillcrest kitchen with a peninsula, white cabinetry and small internal doorway Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo.
Kitchen / Hillcrest transformation

01 / Before

The original kitchen

The U-shaped kitchen had a peninsula and a doorway leading to the back hallway. The doorway reduced the wall space available for cabinetry and limited the kitchen layout.

02 / After

The renovated kitchen

The unused doorway was closed to create more wall space for cabinetry. The U-shaped layout was replaced with a central island that can be accessed from all sides.

04 Project challenge / Layout transformation

Making more of the existing floor plan

The house already had enough floor space, but some of it was not being used well. TRT reworked the hallway, bedrooms, laundry and living area instead of extending the house.

01 / Project challenge

Some of the floor space was not being used well

The house had one bathroom and no ensuite. A narrow bedroom was being used as a playroom, the hallway took up a large amount of floor space, and part of the living room had become a place for toys.

Original Bathrooms
One, with no ensuite
Kitchen Layout
U-shape to central island
New Workspace
Semi-enclosed home office
Consented Work
Structural layout changes
After: spacious Hillcrest living area with exposed beams, pale carpet and built-in desk Before: Hillcrest living room corner with television, sofa, shelving and exposed timber beams Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo.
Living-room corner / Hillcrest transformation

BEFORE

An underused living-room corner

The L-shaped corner beside the main living area did not have a clear use and had become a place for the children's toys and television.

AFTER

A semi-enclosed home office

The corner became a semi-enclosed home office with custom bifold sliding doors, built-in shelving, a custom table and LED strip lighting.

02 / Layout transformation

Reworking the bedroom, hallway and laundry

Part of the laundry was used to make the narrow bedroom larger. Space from the oversized hallway was then used for a bedroom, laundry and extra storage.

Renovated Hillcrest living room with exposed timber beams, light carpet, a wood burner and a built-in desk nook
After renovation / HillcrestThe original timber beams and fireplace were kept beside the new home office.
The outcome

A more functional Hillcrest home with an island kitchen, dedicated workspace, added bathrooms and better use
of the existing floor area.

05 More before & after

Keeping the original features that still worked

The original brick fireplace, wood burner and timber beams were kept. The family bathroom was renovated and the laundry was reworked as part of the full home renovation.

After: retained brick fireplace and black wood burner beside the renovated living area Before: original brick fireplace and black wood burner in the Hillcrest living room Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo.
Fireplace / Hillcrest renovation

Before

Original brick fireplace and wood burner

The living room had a brick fireplace, black wood burner and exposed timber beams.

After

Original fireplace and timber beams retained

The fireplace and wood burner were kept, and LED strip lighting was added to the existing timber beams.

After: Hillcrest bathroom with glass shower, wall-hung vanity, round mirror and grey tiles Before: compact Hillcrest bathroom and laundry with shower, toilet, vanity and washing machines Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo.
Bathroom / Hillcrest renovation

Before

A compact bathroom and laundry

Before the renovation, the house had one bathroom and no ensuite. The laundry was also located in this space.

After

New ensuite, renovated bathroom and reworked laundry

The renovation added an ensuite to the master bedroom, renovated the family bathroom and reworked the laundry.

06 Renovation scope

What changed in the home

The existing layout was changed to add an ensuite and home office, improve the bedrooms and laundry, and make better use of the hallway and storage space.

  1. 01Use part of the oversized hallway for a bedroom, laundry and storage
  2. 02Make the narrow bedroom larger using space from the adjoining laundry
  3. 03Create a master ensuite and walk-in wardrobe
  4. 04Turn a living room corner into a semi-enclosed home office
  5. 05Reorganise the kitchen around a central island
  6. 06Retain the brick fireplace, wood burner and exposed timber beams
  7. 07Renovate the family bathroom and laundry facilities
  8. 08Replace damaged clay drainage discovered beneath the concrete slab

07 Key completed spaces

Kitchen, home office, master suite, bathrooms and laundry

The renovation included a new kitchen layout, semi-enclosed home office, master ensuite and walk-in wardrobe, renovated family bathroom and reworked laundry.

Completed spaces

  1. 01Kitchen with central island
  2. 02Semi-enclosed home office
  3. 03Master suite and walk-in wardrobe
  4. 04Family bathroom and laundry
Completed Hillcrest kitchen with white cabinetry, central island, pale benchtops and warm timber flooring
Kitchen with central island / Hillcrest
Hillcrest family bathroom with grey tiled walls, floating vanity, vessel sink and backlit mirror
Family bathroom / Hillcrest

09Planning a similar renovation?

Auckland’s Full Home Renovation Specialists

One experienced team to plan and coordinate your full home renovation, from the first layout decisions through to the finished spaces.

  • Families who love their location but need a home that works better
  • Homeowners deciding whether to renovate, extend or move
  • People with underused rooms and awkward circulation space
  • Homeowners renovating a kitchen, bathrooms and laundry together
  • Auckland families seeking one coordinated renovation team

10 Renovation process

How we manage a full home renovation

A clear renovation plan helps keep the scope, decisions, trades and timing organised from the start. The exact process depends on the property and agreed scope of work.

  1. 01

    Discuss the home

    Understand the property, the problems to solve and the renovation goals before defining solutions.

  2. 02

    Define scope & priorities

    Bring the renovation areas into one clear brief, separating essential work from optional improvements.

  3. 03

    Coordinate planning & pricing

    Resolve key decisions, consent requirements where applicable, selections, sequencing and pricing before construction begins.

  4. 04

    Manage construction & trades

    Coordinate the builders and trades across the kitchen, bathrooms, laundry, flooring and other agreed work.

  5. 05

    Finish, detail & hand over

    Complete final quality checks, finishing details and the agreed handover process.

11 The result

More space from the existing layout

The kitchen now has a central island, and the master bedroom gained an ensuite and walk-in wardrobe. The family bathroom was renovated, the laundry and bedrooms were reworked, and more storage was added.

An underused corner of the living room became a semi-enclosed home office. The original fireplace, wood burner and timber beams were kept. By changing the existing layout instead of extending the house, the family was able to stay in Hillcrest.

Project decision

STAY and renew

Changing the existing layout gave the family the space they needed without moving or extending the house.

We can change the house, but you can’t change the land.

James Goren
Explore Full Home Renovations

12 Relevant renovation services

Services for renovation projects like this

The Hillcrest project brought together layout changes, a redesigned kitchen, an ensuite, a family bathroom and an upgraded laundry within one coordinated full home renovation.

13 Hillcrest renovation FAQ

Common questions about this Hillcrest renovation

These answers describe the Hillcrest family's decisions, layout changes, consent and drainage work. Scope and timeframes vary between properties.

Why did the family renovate instead of moving?

They liked the Hillcrest location, sunny elevated site, double garage and outdoor space. Their main problems were inside the house, so they explored how a better layout could meet their needs while allowing them to stay.

How was the existing floor space put to better use?

Part of an oversized hallway became useful space for a bedroom, laundry and storage. An awkward corner bedroom was reshaped by reclaiming space from the laundry, while the master bedroom gained an ensuite and walk-in wardrobe.

What changed in the Hillcrest kitchen?

The original U-shaped kitchen and its redundant internal doorway were reworked. Closing the doorway created more room for cabinetry, and an island layout improved movement around the kitchen.

Did the Hillcrest renovation require building consent?

Yes. Structural changes and the new layout required building consent. An architect developed drawings with the homeowners, and the approved plans informed the construction work.

What was discovered beneath the concrete floor?

Existing clay drainage pipes were cracked and broken, with tree roots entering the pipework. The additional drainage work was quoted, approved, completed and inspected before the concrete slab was reinstated.

Which parts of the home were updated?

The work included the kitchen, master ensuite and walk-in wardrobe, reshaped bedrooms, family bathroom, laundry and storage. The living space gained a built-in home office, while the brick fireplace and exposed timber beams were retained.

How long was the family away during construction?

The homeowners stayed in an Airbnb for approximately three months, with the additional drainage work contributing to the programme. This describes their time away; a precise construction duration for the project has not been published.

14Your full home renovation starts here

Could a renovation help you stay in the area you love?

Tell us about your home, the spaces that no longer work and what you would like to change. We can review the property and discuss a suitable renovation scope and next steps.

Discuss My Full Home Renovation

TRT · The Renovation Team Auckland, New Zealand +64 21 230 5511

Send us a message and we will get back to you shortly

+64 21 230 5511
Prefer Not to Use Forms? Call Us!

Do you have any questions?