01 / Before
The original kitchen
The original kitchen had beige cabinetry, a black peninsula benchtop and a diamond-shaped walk-in pantry. Storage at the back was hard to see and usable bench space was limited.
Full Home Renovation · Flat Bush, South Auckland
After 25 years in the same home, these Flat Bush owners refreshed the kitchen, bathrooms, laundry and living spaces while keeping the layout they loved.
02 The project
This Flat Bush full home renovation brought together the rooms and everyday details the owners had wanted to improve after 25 years in the same house.
The original kitchen and bathrooms had served the family since they bought the brick-and-tile home in 2000. Awkward storage, tight bathroom clearances and tired finishes had become daily frustrations.
The team kept the overall layout while renewing the kitchen, ensuite, family bathroom, laundry, wardrobes, flooring, lighting, paint and garage storage as one coordinated project.
03 The transformation
After 25 years in the home, the owners wanted a kitchen with easier-to-use storage and more working space. The team improved the room without removing its walls.
Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo. 01 / Before
The original kitchen had beige cabinetry, a black peninsula benchtop and a diamond-shaped walk-in pantry. Storage at the back was hard to see and usable bench space was limited.
02 / After
A two-door pantry with pull-out drawers made storage easier to reach. Moving the oven beneath the cooktop and wrapping the benchtop around the corner added practical working space.
04 Project challenge / Smarter use of space
The owners liked their home’s overall layout and wanted to keep separate living areas. Small changes to the kitchen door, pantry and fittings made everyday spaces work harder within the existing footprint.
01 / Project challenge
The diamond-shaped pantry hid items at the back, while the kitchen needed more usable bench space. In the ensuite, an inward-opening door and narrow corner shower made a small room feel tighter.
Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo. BEFORE
The original diamond-shaped walk-in pantry looked generous, but items could disappear behind one another. The separate wall oven also used space that could work better as storage.
AFTER
A two-door pantry with pull-out drawers made storage easier to see and reach. Moving the oven beneath the cooktop freed more pantry space, while the kitchen remained in its original footprint.
02 / Practical adjustments
Closing an internal window created a continuous glass splashback. A cavity sliding door gave the kitchen roughly 20 to 30 centimetres more usable space and helped accommodate a double-door fridge.
More accessible storage and working space while retaining the separate living rooms the owners wanted.
05 Renovation scope
The work was planned as one project, with practical changes across the home and a consistent new finish.
06 Project gallery
07 Key completed spaces
The renovation brought the kitchen, ensuite, main bathroom, laundry, wardrobes and garage storage together in one coordinated project. The owners kept the separate living spaces they valued.
Completed spaces


Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo.
Use the left and right arrow keys to compare. Home shows the after photo. End shows the before photo. 08Planning a similar renovation?
One experienced team to plan, coordinate and deliver the kitchen, bathrooms and wider home as a single renovation project.
09 Renovation process
For this Flat Bush home, the team spent about two months planning the scope, products, measurements and sequence before work began.
Start with the rooms that no longer work well, from the ensuite door to kitchen storage and bench space.
Bring the kitchen, bathrooms, laundry, wardrobes, interiors and garage into one agreed scope.
Check clearances, select fittings and cabinetry, then set the order of work before construction.
Coordinate the trades while the owners stayed in temporary accommodation for approximately 11 weeks.
Resolve final details and hand over the refreshed home in time for the owners to return before Christmas.
10 The result
The kitchen gained more useful bench and storage space within its original footprint. An improved ensuite, renewed family bathroom and finished laundry made the home easier to use every day.
Updated wardrobe shelving, garage cabinetry, carpet, paint and lighting brought the wider home together. The owners kept the separate living and family rooms they valued, and returned before Christmas.
Temporary accommodation
~11 weeksOwners stayed elsewhere while the work was carried out
Explore Full Home RenovationsThe kitchen actually became bigger in the same footprint.
James Goren, The Renovation Team
11 Relevant renovation services
This Flat Bush project combined kitchen and bathroom upgrades with laundry, storage and interior work in one full home renovation.
Full home renovation services for Flat Bush and the wider South Auckland area.
Explore service → 02Thoughtfully planned kitchens for cooking, gathering and family life.
Explore service → 03Practical bathrooms completed with a refined contemporary finish.
Explore service →12 Flat Bush renovation FAQ
These answers explain the planning, kitchen layout, bathrooms and temporary accommodation for this Flat Bush project. Each home needs its own scope and schedule.
The project covered the kitchen, ensuite, family bathroom, laundry, wardrobes, garage storage, flooring, carpet, lighting and interior painting.
No. The kitchen stayed within its original footprint. A new pantry, revised appliance positions, continuous splashback and cavity sliding door made the existing space more useful.
An inward-opening door was replaced with a cavity slider. The corner shower became a 900 × 900 mm square shower with a recessed niche.
The owners liked their separate living and family rooms, so the general layout stayed. The improvements focused on clearances, storage, finishes and how each room works.
The team spent about two months working through the scope, measurements, product choices and sequence before construction began.
No. They arranged temporary accommodation for approximately 11 weeks while the work was carried out, then returned before Christmas.
No. Approximately 11 weeks describes these owners’ time away from home. Another project’s construction schedule depends on its own scope and is confirmed during planning.
13Your full home renovation starts here
Tell us which rooms you want to improve and how you want your home to feel. We can review the scope and discuss the next steps for your renovation.
Discuss My Full Home RenovationTRT · The Renovation Team Auckland, New Zealand +64 21 230 5511