Jobs Case Study
Onehunga Vila Restoration Project
Electrical
The electrical fit-out has commenced, with several lights already installed. This stage is progressing well.
27.08.2025
Kitchen
The kitchen cabinets and benchtop have been fully installed. The fit-out looks exceptional and adds a modern, polished appearance to the space.
28.08.2025
Bathrooms
Tiling works are ongoing with epoxy grouting. While the process is slow, it ensures a durable, high-quality finish.
29.08.2025